Works begin soon on the construction of a new archway at the entrance to Collett Park off Cannards Grave Road.

Dave Addicott Engineering Co will be sinking 2 railway wheels into the ground as part of the construction of the entrance archway to Collett Park and the Strawberry Line this week, providing a more attractive entrance to the park off Cannards Grave Road.

The arch itself is then being cut and manufactured locally with a design that draws on the Strawberry line connection. The first stage, starting this week, is to create a firm bespoke foundation that acknowledges and remembers the railway heritage when the Strawberry Line was the main way that produce was transported from the West Country to London and the South East.

The 3 metre CorTen steel* arch will provide a permanent welcoming entrance to both Collett Park and notably, the start of the Strawberry Line that will eventually provide an off-road multi-user path all the way to the sea at via Wells and Cheddar ending at Clevedon on the Severn Estuary. (CorTen steel is an advanced modern metal that initially changes to a warm reddish-brown hue and then stabilises protected by a fine thin layer of rust on the surface.)